ALARP: showing that risk is as low as reasonably practicable
Back to Knowledge Base
Process Safety 6 minKnowledge Base

ALARP: showing that risk is as low as reasonably practicable

2026-11-15

ALARP is not a number. It is an argument, supported by evidence, that further risk reduction would cost far more than the benefit it brings.

The situation

ALARP (as low as reasonably practicable) is the UK legal test for risk reduction. Measures must be implemented unless their cost is grossly disproportionate to the benefit. A demonstration combines good practice, risk assessment and, where useful, cost-benefit analysis.

The principle

Many regulatory regimes require major hazard risks to be reduced as low as reasonably practicable. That means implementing a measure unless its cost, time or effort is grossly disproportionate to the risk reduction it delivers.

Diagram: ALARP
Figure: Atticus Energy, generic illustration.

Three regions

  • Intolerable: must be reduced whatever the cost.
  • Tolerable if ALARP: reduction measures must be considered and adopted unless disproportionate.
  • Broadly acceptable: keep existing controls in place.

Building the argument

  1. Identify the major hazards and the barriers in place.
  2. Compare the design against recognised good practice and standards.
  3. List additional options, following the hierarchy: eliminate, substitute, engineer, administer, protect.
  4. Evaluate each option's risk benefit and cost.
  5. Record why options were adopted or rejected.

Evidence that helps

HAZID and HAZOP records, consequence modelling, quantitative risk results where available, and decision records from design reviews.

Common weaknesses

Arguments that start from the chosen design and work backwards, options dismissed without assessment, and no link between the ALARP case and the actual barriers maintained on site.

Key Takeaways

  • ALARP is an evidenced argument, not a single number.
  • Follow the hierarchy of controls when generating options.
  • Record why each option was adopted or rejected.
  • Link the ALARP case to barriers maintained in operation.

How Atticus helps

We prepare and review ALARP demonstrations, run option workshops and help connect safety cases to day-to-day barrier management.

Real-world examples

Documented incident

Piper Alpha — HSE public inquiry (1988)

The Cullen inquiry led to the UK offshore safety case regime, in which duty holders must demonstrate that major accident risks are reduced to ALARP. That approach is now reflected in the COMAH regulations and in regimes in many other countries.

Read the investigation / source
Illustrative scenario

cost-benefit used backwards

A study used an inflated cost and a low value per fatality avoided to reject a gas detection upgrade. On challenge, good practice alone required the upgrade. CBA cannot be used to argue below recognised good practice.

If you get it wrong

  • Regulatory enforcement and prosecution.
  • Risk tolerated that a reasonable duty holder would have reduced.
  • Weak defence after an incident.
  • Inconsistent decisions across sites.

Relevant standards

Links go to the publisher's official page (ISO, IEC, BSI, API, NFPA, HSE and others). Most standards must be bought from the publisher.

Further reading

Take this briefing with you

A one-to-two page PDF summary: situation, diagram, key takeaways, consequences, examples and standards.