The Engineering Knowledge Behind Project Delivery Decisions
Practical technical references, decision frameworks and industry guides — written by our engineers, for engineers.
51 articles
Production forecasting: building a number people can trust
A forecast is a chain of assumptions about wells, facilities and downtime. Making each link visible is what turns a number into a tool for decisions.
Read moreCorrosion under insulation: the problem you cannot see
Water trapped under insulation corrodes pipe and vessels out of sight. Prevention depends on design detail, good installation and a targeted inspection plan.
Read moreHow to run a HAZID workshop that finds the real hazards
A HAZID is a structured brainstorm early in design. It works when the right people attend, the guidewords fit the facility, and the actions are specific enough to close.
Read moreHAZOP facilitation: practical tips from the chair
A HAZOP tests a design line by line against deviations from intent. Good preparation, firm node boundaries and a disciplined record make it effective rather than exhausting.
Read moreLOPA and SIL: how much protection is enough?
Layer of protection analysis takes a HAZOP scenario and asks whether the independent layers reduce risk far enough. If not, it sets the integrity level a safety instrumented function must meet.
Read moreALARP: showing that risk is as low as reasonably practicable
ALARP is not a number. It is an argument, supported by evidence, that further risk reduction would cost far more than the benefit it brings.
Read moreFacility layout and spacing: designing out escalation
Layout is one of the strongest safety barriers you can choose, and one of the hardest to change later. Spacing, segregation and orientation limit how far a fire or explosion can spread.
Read morePositive isolation: why a closed valve is not enough
Valves leak, get opened by mistake and pass under pressure. Before people break containment or enter equipment, isolation needs to be proven and, for higher-risk work, physical.
Read morePermit to work and job hazard analysis: making controls real
A permit authorises work; a job hazard analysis plans it safely. Both only work when the people doing the job help write them and the site checks them in the field.
Read moreManagement of change: fast for small changes, rigorous for big ones
Many major incidents trace back to a change that was not properly assessed. A good MOC process is proportionate, clear about who decides, and finishes the paperwork after the change.
Read moreUnscheduled deferment: finding and fixing the real causes of lost production
Lost production is rarely one big event. It is many small trips and slowdowns. Recording them consistently and analysing the repeat offenders is where the gains are.
Read moreIntegrated activity planning: one calendar for the whole asset
Drilling, maintenance, projects, inspections and shutdowns all compete for the same people, beds, cranes and process conditions. One integrated plan exposes the clashes before they happen.
Read moreCondition-based maintenance: maintaining on evidence, not the calendar
Time-based maintenance replaces parts that are still healthy and misses ones that fail early. Monitoring condition lets you act when the equipment tells you to.
Read moreSafety-critical elements and performance standards
A safety-critical element is any equipment whose failure could cause or fail to prevent a major accident. Each needs a performance standard that says what good looks like and how it is tested.
Read moreProduction chemicals management: getting value from every litre
Corrosion inhibitors, scale inhibitors, demulsifiers and biocides protect assets and keep production flowing. Without active management they waste money or quietly stop working.
Read moreOperational readiness: ready to run on day one
A project is not finished when construction is complete. It is finished when trained people, procedures, spares and systems are ready to operate the facility safely and reliably.
Read moreStarting up a gas plant: a staged approach
Start-up is the highest-risk period in a plant's life. A staged sequence, from utilities to export, with clear hold points, keeps it controlled.
Read moreProject risk registers that actually change decisions
A risk register is only useful if it drives action. Clear descriptions, honest ratings, named owners and regular review turn it from a compliance file into a management tool.
Read moreCost estimate classes: matching accuracy to project maturity
An early estimate is not wrong because it is uncertain. It is wrong if it claims more accuracy than the definition behind it supports.
Read moreProject premise and basis of design: writing down what everyone is assuming
Most scope disputes start with an unwritten assumption. A project premise and basis of design capture the key decisions early and make changes visible.
Read moreContracting and procurement strategy: choosing how to buy the project
How work is packaged and contracted shapes cost, risk and schedule as much as the design does. A deliberate strategy compares options against the project's real constraints.
Read moreStakeholder engagement: aligning the people who can stop a project
Technical success is not enough. Partners, regulators, operators and communities each need to understand and support the project, and they need it at different times.
Read moreIndependent assurance reviews: a second pair of eyes before big decisions
An independent review asks the questions a busy team stops asking. Timed before key gates, it catches gaps in scope, risk and readiness while they are still cheap to fix.
Read moreWhat goes into a field development plan
A field development plan joins subsurface, wells, facilities, operations and economics into one story. Regulators, partners and lenders all read it for different reasons.
Read moreTotal cost of ownership: looking past the purchase price
The cheapest equipment to buy is often the most expensive to own. Comparing options over their whole life, including energy, maintenance, downtime and disposal, gives better decisions.
Read moreCompetitive scoping: challenging scope before it becomes cost
Scope grows by habit: standard specifications, extra margins and nice-to-have features. A structured challenge, backed by benchmarks, keeps only what the project needs.
Read moreReducing routine flaring: options for associated gas
Flared gas is lost value and avoidable emissions. The right outlet depends on volume, distance to market, composition and how long the field will produce.
Read moreRefrigerated or pressurised? Choosing an LPG storage and export strategy
Pressurised spheres are simple and fast to build. Refrigerated tanks store far more product per unit of steel and suit large export volumes. The right answer depends on throughput, ship size and how much complexity the operator can carry.
Read moreBoil-off gas: sizing for the day that actually happens
Steady-state heat leak is the easy number. Ship loading, pump work, barometric swings and warm rundown are what really size a boil-off gas system, and getting the combination wrong means flaring product.
Read moreFront-end loading: making the big decisions while they are still cheap
Most of a project's value is shaped before detailed design starts. A disciplined front end of Identify, Assess and Select, with honest gate reviews, protects capital far better than heroics in execution.
Read moreBrownfield rehabilitation: rehabilitate, re-rate or replace?
Bringing idle or ageing plant back into service can be far cheaper than building new, but only if the scope is based on evidence. A structured, item-by-item screen turns condition data into clear decisions.
Read moreProcess safeguarding: thinking in barriers, not just devices
Relief valves and trips are only part of the story. A bowtie view shows every barrier between a threat and a loss of containment, and every barrier that limits what happens next, so gaps and weak links are easy to see.
Read moreOperational excellence: a practical map of what good operators manage
Safe, reliable production comes from a few dozen capability areas working together, from work planning and management of change to chemicals and forecasting. Grouping them into five pillars gives each a clear owner and makes gaps easy to spot.
Read moreRefrigerated tank entry and return to service: a step-by-step view
Internal inspection of a refrigerated tank is one of the highest-risk routine jobs in a terminal. Warm-up, purge, gas-freeing, entry and cooldown each have their own hazards, and every step needs time.
Read moreLPG product specifications: what the numbers actually control
Vapour pressure, composition, sulphur and water limits are not paperwork. Each one protects a customer, a ship or a downstream appliance, and each one traces back to a unit in the plant.
Read moreNGL recovery: choosing between refrigeration, lean oil and turboexpander
How much ethane and propane you recover depends on how cold you can make the gas. The technology choice follows from the recovery target, the feed and how much complexity the site can support.
Read moreGas dehydration: glycol or molecular sieve?
Glycol units are cheap and forgiving. Molecular sieves reach the very low water content that cryogenic processes demand. The downstream process decides which you need.
Read moreHydrates: why they form and how to keep them out of your lines
Gas, water, high pressure and low temperature are all it takes to form a solid plug. Hydrate control is about removing one ingredient, or shifting the conditions far enough that it does not matter.
Read moreMEG regeneration and reclamation: closing the inhibitor loop
Recovering MEG makes large-scale hydrate inhibition affordable. The hard part is not boiling off water but managing the salts and contaminants that come back from the wells.
Read moreSour gas basics: H₂S hazards and amine treating
Hydrogen sulphide is toxic at low concentrations and corrosive to many materials. Sour gas facilities are designed around containing it, removing it and protecting people from it.
Read moreCondensate stabilisation: making liquids safe to store and ship
Raw condensate carries light ends that flash in tanks and ships. Stabilisation strips them out so the product meets its vapour pressure limit and storage stays safe.
Read moreProduced water treatment: building the train step by step
Each stage of a produced water train removes a finer fraction of oil and solids. The disposal route, discharge, injection or reuse, sets how far the train needs to go.
Read moreFlare and relief systems: getting the basics right
Relief valves protect equipment; the flare system protects everything downstream of them. Both have to be sized for the worst credible case, and both change whenever the plant does.
Read moreCompressor selection: reciprocating, centrifugal or screw?
Flow, pressure ratio, gas properties and turndown narrow the choice quickly. Reliability and maintenance strategy usually settle it.
Read moreRefrigeration cycles for gas processing: propane, cascade and mixed refrigerant
The colder the duty, the more sophisticated the refrigeration cycle. Simple propane loops serve most gas processing; deep cryogenic duties need cascades or mixed refrigerants.
Read moreMarine loading: managing the ship–shore interface
A jetty is where two different operating systems meet. Clear responsibilities, compatible equipment and rehearsed emergency release make the difference between routine and incident.
Read morePipeline surge analysis: why fast valves need slow thinking
Close a valve quickly on a long liquid line and the pressure wave can exceed the pipe rating. Surge analysis finds those events before they happen.
Read moreLine sizing: rules of thumb and when to stop using them
Velocity and pressure-drop limits get a design close quickly. Two-phase flow, erosion, noise and relief lines are where hand rules run out and proper calculation takes over.
Read moreCorrosion management: from monitoring points to decisions
Corrosion data is only useful if it is taken in the right places and turned into action. A management loop links threats, monitoring, inspection and mitigation.
Read moreRisk-based inspection: spending inspection effort where it matters
Fixed inspection intervals treat every vessel the same. Risk-based inspection ranks equipment by likelihood and consequence of failure and sets intervals to match.
Read moreProject Execution Models: Choosing the Right Delivery Strategy
A reference on the principal project execution strategies — EPC, LSTK, EPCM, Design-Build, CMAR, BOT, PPP and IPD — and the trade-offs each carries for owner control, risk and flexibility.
Read more