Contracting and procurement strategy: choosing how to buy the project
Back to Knowledge Base
Project Delivery 6 minKnowledge Base

Contracting and procurement strategy: choosing how to buy the project

2026-11-15

How work is packaged and contracted shapes cost, risk and schedule as much as the design does. A deliberate strategy compares options against the project's real constraints.

The situation

Contracting strategy (lump-sum EPC, reimbursable, EPCm, alliance) allocates risk and control between owner and contractors. It should match market conditions, definition maturity and the owner's capability to manage interfaces.

What the strategy decides

How the scope is split into packages, what contract type each package uses, how contractors are selected, and how risk is shared. It also covers long-lead procurement and local content.

Diagram: Contracting and procurement strategy
Figure: Atticus Energy, generic illustration.

Inputs

  • Scope maturity and how much may change.
  • Market capacity and contractor appetite.
  • Owner team capability and size.
  • Schedule pressure and long-lead items.
  • Local content and regulatory requirements.

Common options

Lump-sum EPC transfers more risk but needs well-defined scope. Reimbursable models keep flexibility but demand strong owner control. Split packages can suit brownfield work with many interfaces. Frame agreements suit repeat, smaller scopes.

Long-lead items

Identify early and decide whether the owner buys them directly to protect schedule.

Testing the strategy

Workshops with the project team and stakeholders, market soundings and lessons from similar projects help confirm the choice before tendering.

Key Takeaways

  • Match contract type to scope maturity and owner capability.
  • Identify and secure long-lead items early.
  • Test the market before tendering.
  • Record the rationale for the chosen strategy.

How Atticus helps

We develop contracting and procurement strategies, run market soundings and support tender evaluation.

Real-world examples

Illustrative scenario

lump-sum on immature design

An owner tendered lump-sum EPC on a FEED with many open items. Contractors priced the risk heavily or bid low and claimed later. Variation disputes consumed management time and delayed completion.

Illustrative scenario

too many interfaces

Splitting a project into many small packages to save cost created interface gaps between civil, mechanical and electrical scopes. Owner coordination costs and delays more than offset the savings.

If you get it wrong

  • Claims, disputes and adversarial relationships.
  • Cost and schedule overruns from poorly allocated risk.
  • Quality problems and rework.
  • Weak local-content or supply-chain outcomes.

Relevant standards

Links go to the publisher's official page (ISO, IEC, BSI, API, NFPA, HSE and others). Most standards must be bought from the publisher.

Further reading

Take this briefing with you

A one-to-two page PDF summary: situation, diagram, key takeaways, consequences, examples and standards.