What goes into a field development plan
Back to Knowledge Base
Project Delivery 6 minKnowledge Base

What goes into a field development plan

2026-11-15

A field development plan joins subsurface, wells, facilities, operations and economics into one story. Regulators, partners and lenders all read it for different reasons.

The situation

A field development plan (FDP) sets out how a resource will be developed: subsurface description, well plan, facilities concept, export, costs, schedule, HSE, decommissioning and economics. It is often the key regulatory and investment document.

Why it matters

A field development plan (FDP) sets out how a resource will be developed and produced. It underpins regulatory approval, partner commitment and financing.

Diagram: What goes into a field development plan
Figure: Atticus Energy, generic illustration.

Typical contents

  • Subsurface: geology, reservoir properties, volumes and production profiles with uncertainty.
  • Wells: number, type, locations and drilling schedule.
  • Facilities: processing, export routes, utilities and infrastructure.
  • Concept selection: alternatives considered and why the chosen option was preferred.
  • Operations and maintenance: organisation, strategies and costs.
  • HSE: environmental and social impacts, safety approach and mitigation.
  • Decommissioning: end-of-life plans and provisions.
  • Economics: capital and operating costs, revenues and sensitivities.

Telling one story

The most common weakness is sections written in isolation. Profiles should match facility capacity, schedules should match drilling plans, and costs should match the scope.

Flexibility

Show how the plan can adapt to upside or downside cases, for example space for extra wells or phased facility expansion.

Key Takeaways

  • Join subsurface, wells, facilities and economics into one story.
  • Show alternatives and why the concept was selected.
  • Make profiles, schedules and costs consistent.
  • Build in flexibility for upside and downside.

How Atticus helps

We prepare and review field development plans and concept selection reports, with a focus on facilities and integration.

Real-world examples

Illustrative scenario

facilities sized on P10 reserves

An FDP sized the facilities on optimistic reserves. Production plateaued well below capacity, leaving costly unused equipment and higher unit costs.

Illustrative scenario

missing decommissioning provision

An FDP left decommissioning costs out of its economics. When the regulator required financial security later, project value fell sharply.

If you get it wrong

  • Over- or under-sized facilities.
  • Regulatory rejection or delays.
  • Value erosion from poor concept choice.
  • Unfunded decommissioning liabilities.

Relevant standards

Links go to the publisher's official page (ISO, IEC, BSI, API, NFPA, HSE and others). Most standards must be bought from the publisher.

Further reading

Take this briefing with you

A one-to-two page PDF summary: situation, diagram, key takeaways, consequences, examples and standards.