How to run a HAZID workshop that finds the real hazards
Back to Knowledge Base
Process Safety 6 minKnowledge Base

How to run a HAZID workshop that finds the real hazards

2026-11-15

A HAZID is a structured brainstorm early in design. It works when the right people attend, the guidewords fit the facility, and the actions are specific enough to close.

The situation

A HAZID is a structured, guideword-based brainstorm that identifies hazards early, often at concept or Select stage. It needs the right team, clear scope and nodes, a good scribe, and an action register that is tracked to close-out.

Purpose

A Hazard Identification (HAZID) study identifies major hazards early, while layout and concept can still change. It is broader and less detailed than a HAZOP.

Diagram: How to run a HAZID workshop that finds the real hazards
Figure: Atticus Energy, generic illustration.

Before the workshop

  • Define the scope and split the facility into areas or nodes.
  • Select guidewords that suit the facility: process, external, environmental, health, security and construction hazards.
  • Collect the basis: plot plan, block diagrams, process description and design philosophies.
  • Choose a team that includes operations and maintenance, not just designers.

During the workshop

For each node and guideword, record the hazard, causes, consequences, existing safeguards, risk ranking and actions. Keep the pace steady; capture parking-lot items separately.

Good actions

A good action is specific, has an owner and can be closed with evidence. "Review layout" is not an action; "confirm spacing between the LPG spheres and the control building meets the fire study" is.

After the workshop

Issue the report quickly, track actions in a register, and bring unresolved items into design reviews and the risk register.

Facilitation tips

An experienced, independent facilitator keeps the team on track and makes sure quiet participants are heard. A scribe who knows the technical language saves a great deal of rework.

Key Takeaways

  • HAZID early, while the concept can still change.
  • Tailor guidewords to the facility.
  • Bring operations and maintenance into the room.
  • Write actions that can be closed with evidence.

How Atticus helps

We facilitate HAZID studies for greenfield and brownfield projects and help teams close actions efficiently.

Real-world examples

Documented incident

Sleipner A gravity base structure (1991)

The concrete gravity base structure for the Sleipner A platform sank during a controlled ballasting test because of a design calculation error. Early, independent challenge of design hazards and assumptions is exactly what structured hazard reviews and independent checks aim to provide.

Read the investigation / source
Illustrative scenario

HAZID too late

A HAZID held after the layout was frozen identified that the control room was downwind of a gas compression area. Relocating it then meant redesign, not a simple layout change.

If you get it wrong

  • Major hazards discovered late, when changes are expensive.
  • Actions left open and never implemented.
  • An inherently unsafe layout or concept locked in.
  • Weak evidence for the safety case or permit applications.

Relevant standards

Links go to the publisher's official page (ISO, IEC, BSI, API, NFPA, HSE and others). Most standards must be bought from the publisher.

Further reading

Take this briefing with you

A one-to-two page PDF summary: situation, diagram, key takeaways, consequences, examples and standards.