Line sizing: rules of thumb and when to stop using them

2026-11-15

Velocity and pressure-drop limits get a design close quickly. Two-phase flow, erosion, noise and relief lines are where hand rules run out and proper calculation takes over.

The situation

Line sizing balances pressure drop, velocity, erosion, noise, vibration and cost. Rules of thumb (velocity limits, ΔP per 100 m, API RP 14E erosional velocity) are useful for screening. Final sizes should be confirmed by hydraulic calculation.

Why rules of thumb help

Early in design, quick sizing by velocity and pressure-drop limits gives line sizes good enough for layout, cost estimates and hydraulic checks. Experienced engineers carry a set of these numbers for each service.

Diagram: Line sizing
Figure: Atticus Energy, generic illustration.

Common criteria

  • Pump suction lines: keep pressure drop low to protect net positive suction head.
  • Liquid discharge lines: balance velocity, pressure drop and cost.
  • Gas lines: limit pressure drop and check velocity for noise and erosion.
  • Steam and utility lines: use service-specific limits.

Where they stop working

  • Two-phase flow. Flow regime, slugging and erosion need proper multiphase analysis.
  • Relief and flare lines. Back pressure on relief valves must be calculated, not estimated.
  • Erosive service. Sand or droplets at high velocity need erosion checks.
  • Long lines. Small errors in pressure drop add up.

Good practice

Record the basis for each line size in a line list. When flow rates change during design or operation, the basis shows quickly which lines need rechecking.

Key Takeaways

  • Hand rules are for screening; verify with calculation.
  • Two-phase and relief lines always need proper analysis.
  • Check erosion where solids or high velocities occur.
  • Keep the sizing basis in the line list.

How Atticus helps

We prepare hydraulic calculations, line lists and debottlenecking checks, and we build lightweight calculation tools for rapid screening.

Real-world examples

Illustrative scenario

erosion in sandy service

A choke-downstream line was sized on pressure drop alone. Sand at high velocity eroded a bend within months, which was found by chance during an inspection. Sizing for erosional velocity, or adding sand monitoring, would have prevented it.

Illustrative scenario

flow-induced vibration

Undersized small-bore connections on a high-velocity gas line suffered fatigue cracking from vibration. Industry guidance recommends screening for flow-induced vibration and acoustic fatigue at design stage.

If you get it wrong

  • Erosion and fatigue failures.
  • Excessive pressure drop that limits throughput.
  • Noise and vibration that harm personnel and equipment.
  • Over-sizing that adds unnecessary capital cost.

Relevant standards

Links go to the publisher's official page (ISO, IEC, BSI, API, NFPA, HSE and others). Most standards must be bought from the publisher.

Further reading

Take this briefing with you

A one-to-two page PDF summary: situation, diagram, key takeaways, consequences, examples and standards.