
Vapour pressure, composition, sulphur and water limits are not paperwork. Each one protects a customer, a ship or a downstream appliance, and each one traces back to a unit in the plant.
The situation
LPG is traded against specifications for vapour pressure, composition (C2 and C5+ limits), sulphur, water and corrosivity. If a plant cannot meet the spec consistently, product is downgraded, reprocessed or rejected at the receiving terminal.
A cargo of LPG is sold against a specification sheet. If it fails, it can be rejected, blended down at a discount or held at the terminal. Understanding what each line on the sheet protects makes it easier to see which plant unit is responsible and where the margin really is.
Export grades and local market grades are not always the same. Where a plant supplies both, storage segregation and line flushing become part of quality control.
We review fractionation and treating performance against product specifications, set up quality control plans for storage and export, and help resolve recurring off-spec problems.
An upstream deethaniser upset raised ethane in the propane product. Vapour pressure exceeded the cargo specification, so the cargo was held and part of it re-routed for reprocessing. Demurrage and price penalties built up while the column was re-tuned.
The derailment of an LPG rail tank car released product that ignited in a residential area, with many fatalities. Specification, packaging and transport integrity are all part of the LPG supply chain.
Read the investigation / sourceLinks go to the publisher's official page (ISO, IEC, BSI, API, NFPA, HSE and others). Most standards must be bought from the publisher.
Take this briefing with you
A one-to-two page PDF summary: situation, diagram, key takeaways, consequences, examples and standards.