A jetty is where two different operating systems meet. Clear responsibilities, compatible equipment and rehearsed emergency release make the difference between routine and incident.

The situation

Loading LPG or LNG carriers brings together two systems, ship and shore, with separate owners and crews. The interface relies on compatibility checks, ship/shore safety checklists, linked emergency shutdown (ESD), emergency release couplings and agreed loading rates.

Two systems, one operation

The ship and the terminal each have their own crews, procedures and control systems. Loading safely depends on agreeing who controls what, and on equipment that is compatible on both sides.

Diagram: Marine loading
Figure: Atticus Energy, generic illustration.

Key elements

  • Mooring and berthing. Line arrangements, fender capacity and weather limits.
  • Loading arms or hoses. Rated for the product, temperature and envelope of ship movement.
  • Emergency release. Couplings that close and separate quickly if the ship moves beyond limits.
  • Vapour return. Displaced vapour from the ship goes back to shore for recovery.
  • Communications and shutdown links. Either side can stop transfer quickly.

The loading sequence

Arrival and mooring, joint safety checks, connection and leak testing, cooldown of arms and lines, bulk loading, topping off, drainage and purging, then disconnection.

Rate limits

For refrigerated products, the loading rate is often limited by how much vapour the terminal can handle, not by pump capacity. Agree the rate profile in advance.

Lessons from operations

Many incidents involve moorings, drainage of arms before disconnection, or unclear handover of responsibility. A good ship–shore checklist and regular joint drills address all three.

Key Takeaways

  • Agree control and responsibility before transfer starts.
  • Emergency release systems must be tested, not just installed.
  • Vapour handling often sets the loading rate.
  • Joint drills build confidence on both sides.

How Atticus helps

We review jetty and loading arrangements, support marine terminal studies, and help develop loading procedures and ship–shore safety checklists.

Real-world examples

Illustrative scenario

ESD link not tested

The ship/shore ESD link was not function-tested before loading. When a shore valve closed unexpectedly, the ship's pumps kept running against it, producing a pressure surge in the loading arm. Industry guidance from SIGTTO and OCIMF calls for pre-transfer testing of these links.

Illustrative scenario

excessive vessel motion

Mooring lines were not adjusted for tide and passing-ship effects. Vessel movement approached the loading-arm envelope limits, and the arms had to be disconnected under emergency release conditions.

If you get it wrong

  • Loss of containment at the manifold or loading arm.
  • Surge pressure damage and hose or arm failure.
  • Ship delays and commercial claims.
  • Port authority restrictions on terminal operations.

Relevant standards

Links go to the publisher's official page (ISO, IEC, BSI, API, NFPA, HSE and others). Most standards must be bought from the publisher.

Further reading

Take this briefing with you

A one-to-two page PDF summary: situation, diagram, key takeaways, consequences, examples and standards.