
Each stage of a produced water train removes a finer fraction of oil and solids. The disposal route, discharge, injection or reuse, sets how far the train needs to go.
The situation
Produced water must be treated to meet discharge or re-injection limits for oil-in-water, solids and chemicals. A typical train uses separators, hydrocyclones, gas flotation and, where needed, filtration or polishing.
Produced water may be discharged, reinjected for pressure support, disposed of in wells, or reused. Each destination has its own limits on oil content, solids, oxygen and chemistry. Start from the destination and work backwards.
Water rates usually rise over field life. Allow space and tie-ins for extra stages, and check that chemicals used upstream do not defeat the treatment downstream.
Oil-in-water analysers are only as good as their calibration and sample points. Regular laboratory checks and stage-by-stage sampling show where the train is losing performance.
We design and troubleshoot produced water systems and have built browser-based screening tools for treatment trains. We can help size stages and assess upgrade options.
A change in demulsifier and rising water cut created stable emulsions. Oil-in-water at the overboard discharge exceeded the permit, leading to a regulatory report and reduced oil rates until chemicals were re-optimised.
Solids and oil carried over into water-injection wells plugged the formation. Injectivity fell, reservoir pressure support dropped and well workovers were needed.
Links go to the publisher's official page (ISO, IEC, BSI, API, NFPA, HSE and others). Most standards must be bought from the publisher.
Take this briefing with you
A one-to-two page PDF summary: situation, diagram, key takeaways, consequences, examples and standards.