
Fixed inspection intervals treat every vessel the same. Risk-based inspection ranks equipment by likelihood and consequence of failure and sets intervals to match.
The situation
Risk-based inspection (RBI) ranks equipment by probability and consequence of failure. It then focuses inspection effort where risk is highest, setting intervals and methods instead of applying fixed calendar periods.
Risk-based inspection (RBI) ranks equipment by the likelihood of failure and the consequence if it fails. High-risk items get more frequent or more searching inspection; low-risk items can be inspected less often without increasing overall risk.
Driven by damage mechanisms, corrosion rates, remaining wall, operating history and the effectiveness of past inspections.
Driven by the fluid, inventory, pressure, location, and the potential for fire, toxic release, environmental harm and lost production.
Done well, RBI improves safety and reduces cost at the same time, by focusing effort and extending intervals with justification.
We set up and review RBI programmes, identify damage mechanisms, and help operators justify interval extensions with sound data.
At Chevron Richmond, sulfidation corrosion thinned susceptible piping that had not been targeted with comprehensive inspection. The CSB emphasised identifying active damage mechanisms and inspecting the susceptible components, which is the core logic of RBI.
Read the investigation / sourceAn RBI study used design corrosion rates instead of measured data. It extended intervals on lines that were actually thinning quickly. RBI is only as good as its damage-mechanism review and inspection data.
Links go to the publisher's official page (ISO, IEC, BSI, API, NFPA, HSE and others). Most standards must be bought from the publisher.
Take this briefing with you
A one-to-two page PDF summary: situation, diagram, key takeaways, consequences, examples and standards.