The cheapest equipment to buy is often the most expensive to own. Comparing options over their whole life, including energy, maintenance, downtime and disposal, gives better decisions.
The situation
Total cost of ownership (TCO) or life cycle costing compares options over the whole asset life: capex, opex, energy, maintenance, downtime, emissions and decommissioning, discounted to present value. ISO 15663 gives the method for oil and gas.
Total cost of ownership (TCO) adds up every cost of an asset over its life: purchase, installation, energy, consumables, maintenance, downtime and disposal.
Use real maintenance and failure data from similar equipment where available. Include the cost of deferred production for critical equipment; it is often the largest element.
Build TCO into bid evaluation so suppliers compete on whole-life value, not just price.
We build whole-life cost comparisons for equipment and materials decisions and support value-based bid evaluation.
A low-cost pump with poor efficiency was chosen to save capital. Over 20 years its extra power use and maintenance cost several times its purchase price.
Omitting a spare compressor saved capital, but deferment costs exceeded the saving in the first year of operation.
Links go to the publisher's official page (ISO, IEC, BSI, API, NFPA, HSE and others). Most standards must be bought from the publisher.
Take this briefing with you
A one-to-two page PDF summary: situation, diagram, key takeaways, consequences, examples and standards.