Total cost of ownership: looking past the purchase price
Back to Knowledge Base
Operations 5 minKnowledge Base

Total cost of ownership: looking past the purchase price

2026-11-15

The cheapest equipment to buy is often the most expensive to own. Comparing options over their whole life, including energy, maintenance, downtime and disposal, gives better decisions.

The situation

Total cost of ownership (TCO) or life cycle costing compares options over the whole asset life: capex, opex, energy, maintenance, downtime, emissions and decommissioning, discounted to present value. ISO 15663 gives the method for oil and gas.

The idea

Total cost of ownership (TCO) adds up every cost of an asset over its life: purchase, installation, energy, consumables, maintenance, downtime and disposal.

Diagram: Total cost of ownership
Figure: Atticus Energy, generic illustration.

Where TCO changes the answer

  • Pumps and compressors, where energy use dominates.
  • Materials selection, where corrosion-resistant options cost more upfront but less to maintain.
  • Sparing decisions, where an installed spare avoids costly downtime.
  • Packaged versus custom equipment.

How to compare

  1. Define the options on the same basis and duty.
  2. Estimate each cost element over the planned life.
  3. Discount to present value.
  4. Test sensitivity to energy price, failure rates and life.

Practical tips

Use real maintenance and failure data from similar equipment where available. Include the cost of deferred production for critical equipment; it is often the largest element.

Procurement

Build TCO into bid evaluation so suppliers compete on whole-life value, not just price.

Key Takeaways

  • Compare options over their whole life.
  • Include the cost of downtime for critical equipment.
  • Test sensitivity to energy price and failure rates.
  • Evaluate bids on whole-life value.

How Atticus helps

We build whole-life cost comparisons for equipment and materials decisions and support value-based bid evaluation.

Real-world examples

Illustrative scenario

cheapest pump, highest cost

A low-cost pump with poor efficiency was chosen to save capital. Over 20 years its extra power use and maintenance cost several times its purchase price.

Illustrative scenario

no spare compressor

Omitting a spare compressor saved capital, but deferment costs exceeded the saving in the first year of operation.

If you get it wrong

  • Higher life-cycle cost than alternatives.
  • Energy and emissions penalties.
  • Poor availability and production losses.
  • Early replacement or retrofit.

Relevant standards

Links go to the publisher's official page (ISO, IEC, BSI, API, NFPA, HSE and others). Most standards must be bought from the publisher.

Further reading

Take this briefing with you

A one-to-two page PDF summary: situation, diagram, key takeaways, consequences, examples and standards.