Lost production is rarely one big event. It is many small trips and slowdowns. Recording them consistently and analysing the repeat offenders is where the gains are.

The situation

Unscheduled deferment is production lost to unplanned events: trips, failures and process upsets. Systematic root cause analysis (RCA) of significant events, with data captured to ISO 14224 taxonomy, drives the reliability improvements that recover that production.

What deferment means

Deferment is production lost against the potential of the asset. Planned deferment comes from scheduled shutdowns and maintenance. Unscheduled deferment comes from trips, failures, process upsets and external causes.

Diagram: Unscheduled deferment
Figure: Atticus Energy, generic illustration.

Record consistently

Every loss needs a start and end time, volume, system, equipment and an agreed cause code. Without consistent coding, the biggest problems hide in "other".

Rank and focus

Sort losses by total volume and by frequency. A few systems usually account for most of the loss. These are the candidates for root-cause analysis.

Root-cause analysis

Use a structured method such as cause-and-effect trees or "five whys". Look beyond the failed part to why it failed: design, operating conditions, maintenance strategy or procedures.

Fix and verify

Actions should remove the cause, not just restore the equipment. After the fix, track whether the loss category actually falls.

Making it routine

A short weekly review of deferment by operations and maintenance keeps attention on the top offenders and stops new problems becoming chronic.

Key Takeaways

  • Record every loss with consistent cause codes.
  • A few systems usually cause most of the loss.
  • Fix the cause, not just the failed part.
  • Verify that the loss actually stops.

How Atticus helps

We set up deferment accounting, run root-cause analyses on chronic losses, and support improvement programmes for producing assets.

Real-world examples

Documented incident

Husky Energy Superior refinery — CSB (2018)

At Husky Superior, the CSB investigation traced an explosion during FCC unit shutdown to an eroded slide valve that allowed air and hydrocarbons to mix. A good RCA goes past the immediate failure to the inspection and design factors behind it.

Read the investigation / source
Illustrative scenario

repeat trips

A compressor tripped on high vibration twelve times in a year. Each trip was reset without investigation. A single RCA found a misaligned coupling and a faulty probe, and fixing both recovered several days of production a year.

If you get it wrong

  • Repeat failures and chronic production losses.
  • Safety incidents developing from tolerated abnormal events.
  • Fixing symptoms instead of root causes.
  • Poor data that undermines reliability decisions.

Relevant standards

Links go to the publisher's official page (ISO, IEC, BSI, API, NFPA, HSE and others). Most standards must be bought from the publisher.

Further reading

Take this briefing with you

A one-to-two page PDF summary: situation, diagram, key takeaways, consequences, examples and standards.